Maintenance
75
The indicator box color changes to green and the name of the button changes
to Press for Standby.
7.
Select
Pump
from the
Options
menu.
This starts the forepump and the turbomolecular pump. Watch the vacuum
gauge readout and allow time for the gauge to achieve 4 x 10-5 Torr.
8.
Observe the displayed masses.
Mass 4 (helium) should be much larger than mass 18 (water), which should be
larger than mass 28 (nitrogen), which should be about 4 times larger than mass
32 (oxygen).
9.
If the nitrogen and oxygen are larger it indicates an air leak, which could
damage the filament. Immediately click
Press for Standby
to turn off the
filament.
10.
If a leak exists, locate and fix it.
Typical areas to check for leaks are around fittings and areas under vacuum.
Содержание Clarus SQ 8 MS Series
Страница 1: ...CLARUS SQ 8 MS Hardware Guide GAS CHROMATOGRAPHY ...
Страница 2: ......
Страница 3: ...Clarus SQ 8 MS Hardware Guide ...
Страница 8: ......
Страница 9: ...Warnings and Safety Information 1 ...
Страница 10: ......
Страница 18: ...Label Location and Content Figure 1 Front View of Clarus SQ 8 T ...
Страница 46: ......
Страница 47: ...Introduction 2 ...
Страница 48: ......
Страница 52: ......
Страница 53: ...About the Clarus GC MS System 3 ...
Страница 54: ......
Страница 64: ......
Страница 67: ...Maintenance 65 Maintenance 4 ...
Страница 68: ......
Страница 69: ...Maintenance 67 ...
Страница 98: ...Clarus SQ 8 MS Hardware Guide 96 Figure 19 Inserting the Plug Handle and Sight ...
Страница 148: ...Troubleshooting 5 ...
Страница 149: ...Troubleshooting 147 ...
Страница 178: ...TurboMass Software Installation 176 ...
Страница 179: ...Index ...
Страница 180: ......
Страница 183: ......