
95
9
7
C3 Suspension on the Structure
Fig. C3.02
Fig. C3.02a
Climbing units with working plat-
form (Version 2)
Fold up the pre-assembled Foldable
Covers and attach to the Screen Ele-
ments.
1.
Remove or secure all loose compo-
nents.
2.
Attach Crane Eye BR-2 2.5 t to enclo-
sure post, see Section "Assembly of
Attachment Points" on Page 69. Dis-
tance to working platform approx.
2.0 m.
3.
Adjust Lifting Beam
9 t
(9) to suit the
climbing rail spacings.
4.
Attach chain lifting gear to Crane
Eyes. Lead chains along the space of
the
enclosure post.
5.
Secure guide ropes to the climbing
enclosure.
6.
Align and lift the climbing unit.
(Fig. C3.02 + C3.02a)
Follow Instructions for Use for the Lift-
ing Beam
9 t
and Crane Eye BR-2!
Components
7
9
Crane Eye BR-2 2.5 t
Lifting Beam
9 t
77
Timber 120/100 mm
LPS Screen Lightweight Climbing Enclosure
Instructions for Assembly and Use – Standard Configuration