2
Preparations
1. Assemble the top Slab Shoes (10a)
on the next floor slab. Open foldable
skids on top Slab Shoe (10a), deacti-
vate climbing pawl.
2. Adjust the height of the top Slab
Shoe so that the climbing enclosure
is subsequently aligned.
3. Activate climbing pawls on the mid-
dle Slab Shoe (10b). The load is car-
ried on the bottom Slab Shoe (10c).
4. Remove temporary connections be-
tween the climbing units.
5. Dismantle formwork in the area of
the slab edge.
6. Mount trailing guardrails (99).
7. Fold up Foldable Covers (40) and se-
cure by sliding laterally behind the
Climbing Rail.
8. From a safe position, attach crane
lifting gear to Crane Eye BR 2.5 t.
See Section "Connection Point for
Crane" on Page 40.
9. Leave climbing enclosure and area of
risk.
(Fig. D4.01 + D4.02)
For operating of the Slab Shoes, see
Section "Assembly of the Slab Shoe
LPS" on Page 108 as well as Section
"Activating and Deactivating the Climb-
ing Pawl" on Page 113.
Components
2
Climbing Rail-2 LPS
10
Slab Shoe-2 LPS
40
Foldable Cover
99
Guardrail, e.g. PROKIT
D4 Moving by Crane
Fig. D4.01
Fig. D4.02
LPS Screen Lightweight Climbing Enclosure
Instructions for Assembly and Use – Standard Configuration