
104
16
81, 86
81, 86
4
13
16.7
16.9
16.1
16.8
16.4
4
16
16.7
a
118,5 – 201,7
D1 Suspension and Anchoring
Fixing the Leading Anchor
With the Slab Anchor Template-2 LPS
(16), the Leading Anchor (13) is fixed in
position during concreting.
Variable length a = up to 1000 mm, see
following pages.
– The stop on the support plate creates
an impression in the concrete.
– For transportation, completely insert
the Slab Anchor Template, fold up and
then secure with Fitting Pins!
Assembly
1. Attach Slab Anchor Template (16) to
the enclosure post (4) by means of
Fitting Pins (81) and Cotter Pins (86).
2. Fix Leading Anchor (13) to Support
M24 (16.7).
3. Swivel Slab Anchor Template down-
wards.
4. Adjust length a:
– Release wing screws (16.8) on the
clamping piece.
– Move clamping piece to required
position.
– Place support plate (16.1) on
stopend formwork and fix using
nails or screws (holes Ø 5 mm).
– Tighten wing screws.
5. Adjust Slab Anchor Template on the
Height Adjustment DW 15 (16.4) to
the correct height using the spirit lev-
el.
(Fig. D1.01 + D1.02)
Components
4
Enclosure Post
13
Leading Anchor
16
Slab Anchor Template-2 LPS
16.1
Support Plate
16.4
Height Adjustment
16.7
Support M24
16.8
Wing Screw
16.9
Handgrip
81
Fitting Pin Ø 21x120
86
Cotter Pin 4/1
Fig. D1.01
Fig. D1.02
LPS Screen Lightweight Climbing Enclosure
Instructions for Assembly and Use – Standard Configuration