
98
2.1
10.2
10.6
98
C3 Suspension on the Structure
Fig. C3.05
Fig. C3.05a
Fig. C3.05b
3. Insert Climbing Rail into the top Climb-
ing Shoe (10a) using the Guide-In Tool
(98). (Fig. C3.05a)
4. Close the folding runners (10.3) of the
top Climbing Shoe and secure.
5. Remove Guide-in Tool.
6.
7. Align climbing unit.
8. Tighten guiding brackets (10.6) of all
Slab Shoes.
9. Completely relieve crane and release
crane lifting gear from a safe position.
(Fig. C3.05)
Components
2.1
Spacer LPS 52
10
Slab Shoe-2 LPS 10 t
10.2
Climbing Pawl
10.3
Folding Runners
10.6
Guiding Bracket
98
Guide-in Tool
LPS Screen Lightweight Climbing Enclosure
Instructions for Assembly and Use – Standard Configuration