B2 Planning the Units
Platform Extension
Platform extensions are required, e.g.
when using Telescopic Screens.
Platform extension with 2 Platform
Beams
The Platform Beams (34) for platform
extensions are bolted to the available
Platform Beam (35) using Bolts M16x40
(72) and Nuts (72.1) (4x per platform ex-
tension).
(Fig. B2.07)
Minimum spacing of bolts S ≥ 250 mm.
Working platform load according to Scaf-
fold Group 2:
Max. live load 150 kg/m²
with single loads of
150 kg, disributed over area 50x50 cm,
or 100 kg, distributed over area 20x20 cm.
Components
34
Platform Beam LPS 123 or 173
35
Platform Beam LPS
35.5
Platform Cover LPS 37.5 x 107.5
72
Bolt ISO 4017 M16x40-8.8
72.1
Nut ISO 7040 M16-8
Fig. B2.07
Permissible cantilever with 2 Platform Beams
Bracket spacing
c
Permissible cantilever
d
Table B2.02
LPS Screen Lightweight Climbing Enclosure