
75
32
81/86
2.1
2
43
43
74
2
97
74.1
46
74
≤ 2
0
ca. 4
5
226 m
m
Assembly of the Enclosure
Post
1. Turn Climbing Rail 398 (2) so that the
Spacers (2.1) are on the upper side.
2. Position the Climbing Rail on the Plat-
form Cantilever Beam (32) with the
crane.
3. Secure the Climbing Rail with 2x Fit-
ting Pins (81) and Cotter Pins (86).
(Fig. C1.15)
C1 Pre-Assembly
Assembly of the Cover Flaps
1. Fix scaffold tube (43) to the Climbing
Rails (2) using Clamp A64 M12 (74)
and Nuts M12 (74.1). The position is
specified in the planning documents.
Lateral projection is 226 mm.
2. As transport locking device, screw
one tie rod (97) into both climbing rails
with cam nuts. Tie rod has a max.
20 cm projection on the outside.
(Fig. C1.16 - C1.16a)
Alternatively, mount scaffold tube with
Scaffold Tube Connector (46).
Components
2
Climbing Rail-2 LPS
2.1
Spacer LPS 52
32
Platform Cantilever Beam LPS
43
Scaffold Tube Ø 48/M10 LPS
46
Scaffold Tube Connector Ø 48-
M10 LPS
74
Clamp A64 DIN 3570, M12
74.1
Nut ISO 4032, M12-8
81
Fitting Pin Ø 21x120
86
Cotter Pin 4/1
97
Tie Rod
Fig. C1.15
Fig. C1.16
Fig. C1.16a
LPS Screen Lightweight Climbing Enclosure
Instructions for Assembly and Use – Standard Configuration