B2 Planning the Units
General
Observe the following points for plan-
ning and the work instructions for the
climbing sequence:
Especially on the corner and internal
platforms, the decking is to be in-
stalled so that it does not collide with
the platforms of adjacent climbing en-
closures during the climbing proce-
dure. As a rule, the mitred standard
corner solution ensures this.
If overlapping components are
planned between the climbing enclo-
sures, then the climbing sequence is
to be planned accordingly and be
clearly indicated on the general ar-
rangement drawings. Overlapping
components are, for example, cover-
ing for the gaps between the climbing
enclosures or projecting telescopic
screens.
The gaps between the platforms of
the climbing enclosures are to be cov-
ered so that they cannot be moved.
Remove any fixed covers before
climbing and mount again afterwards.
However, the elastomer covers of the
LPS System can normally remain on
the platforms.
Especially for non-symmetrical climbing
units, PERI recommends the use of the
Lifting Beam
9t.
– Follow Instructions for Use at all
times!
– Ensure loads are evenly balanced
when being picked up.
When climbing by crane, always pro-
vide a safe possibility to attach and
detach crane lifting gear. Additional
double crane slings that remain on the
climbing enclosure may be necessary
until they can be safely dismantled.
A hydraulics plan shows how the
climbing device with the hydraulic
hoses is to be correctly attached to
the hydraulic pump.
Appropriate measures are to be speci-
fied regarding safety barriers or guard-
rails.
Attachment Point for the
Crane
The size of the climbing enclosures can
be limited by the permissible load of the
attachment point on the climbing rail.
For this, the weight of the decisive pan-
els is to be determined during the plan-
ning phase.
The permissible load of the attachment
point is also to be considered for the as-
sembly and dismantling of the climbing
enclosures that are to be moved with
the self-climbing device.
The weight G = V
1
+ V
2
of the climbing
enclosures is to be specified in the gen-
eral arrangement drawings.
(Fig. B2.01)
For safe attachment and removal of the
crane hook or for subsequent installation
of compression braces, provide suitable
measures to prevent falls.
Fig. B2.01
LPS Screen Lightweight Climbing Enclosure