D5 Moving with the Climbing Device
Moving Procedure
For a detailed explanation of the individ-
ual steps, see Section "Self-Climbing
Procedure" on Page 123.
1. Activate climbing pawls on the middle
Slab Shoe (10b).
2. Only Version 1: insert Climbing Rails
into the top Slab Shoe (10a) using the
Guide-In Tool and close the guiding
skids. Deactivate the climbing pawl.
3. Insert climbing device (90) and en-
gage with bolt of the middle Slab
Shoe (10b).
4. Fold up Foldable Covers (40) and se-
cure them by shifting laterally or by
means of wiring.
5. All personnel to leave the climbing en-
closure; control climbing procedure
from a safe position.
6. Raise the climbing enclosure from the
middle Slab Shoe with the Climbing
Device LPS 30 kN (90) in 50 cm
steps. (Fig. D5.02 + D5.02a)
7. Only Version 2: when the Climbing
Rail (2) has reached the top Slab Shoe
(10a):
– Stop the climbing procedure and in-
sert the Climbing Rail into the Slab
Shoe.
– Continue climbing.
8. After the required protection height
has been reached:
– Stop the climbing procedure.
– Position the climbing unit with
Spacer LPS 52 on the middle Slab
Shoes.
Components
2
Climbing Rail-2 LPS
10
Slab Shoe-2 LPS
40
Foldable Cover
90
Climbing Device LPS 30 kN
Fig. D5.02
Fig. D5.02a
inactive
active
inactive
LPS Screen Lightweight Climbing Enclosure
Instructions for Assembly and Use – Standard Configuration