CT/L-14 Controller
19
Note:
•
The
Device output operating mode
OD parameter is to be in
Potential
for
PERCo
turnstiles.
•
The
Registration of the passage after ID card presentation
OD
parameter is to be in
Yes
for
WMD-05S
and
WMD-06
swing gate.
Follow the next recommendations to connect the turnstile (the gate) to controller:
1. To dissipate static electricity, it is recommended to ground the turnstile housing. It is necessary
to use the cable with cross section of minimum 0.75 mm
2
.
Note:
Connection layout of power circuit of the controller and the turnstile (the gate) in case of
connection via
PoE
-splitter is given in Fig. 17.
2. Connect the turnstile (the control unit of the turnstile) #1 to
XT1
,
XT6
,
XT7
terminal blocks of
the controller lower board in compliance with the layout (Fig. 6).
3. Connect the turnstile (the control unit of the turnstile) to
XT1
,
XT8
,
XT9
terminal blocks of the
controller lower board in compliance with the layout (Fig. 6).
4. Connect the swing gate (the control unit of the turnstile) to
XT1
,
XT6
,
and
XT7
terminal blocks
of the lower board of the controller in compliance with the layout (Fig. 7).
5. Connect the swing gate (the control unit of the turnstile) to
XT1
,
XT8
,
and
XT9
terminal blocks
of the lower board of the controller in compliance with the layout (Fig. 7).
6. Connect RC-panel (or WRC) #1 to
XT2
terminal block of the lower board of the controller in
compliance with the layout (Fig. 10).
7. Connect RC-panel (or WRC) #2 to
XT10
terminal block of the lower board of the controller in
compliance with the layout (Fig. 10).
8. Fix cables with plastic ties to self-adhesive cable tie mount, included into delivery set, by
installing them inside the controller housing.
Figure 7. Connection layouts of the gates
Содержание CT/L-14
Страница 1: ...Controller CT L 14 ASSEMBLY AND OPERATION MANUAL...
Страница 2: ...CT L 14 Controller Assembly Operation Manual...
Страница 58: ...www perco com...