Operation Manual
14
•
Crossing of all cables with power cables is allowed only at a right angle.
•
Cable growth is to be performed by soldering only.
•
All cables, entering controllers, should be fixed with plastic ties to self-adhesive cable tie
mount, included into delivery set and installed inside the housing. Lay and fix cables using
plastic fixing brackets, if necessary.
•
After cables are laid, check if there are no line breaks and short circuits at all lines.
•
It is not allowed to lay lock power cables, detector cables, remote control cables and reader
cables at a distance more than 1 m from ground cables.
8.2 Installation order
Connection to the controller is performed in accordance with layout shown in Fig. 3 - 11 with the
use of cables from Table 3. The terminal blocks positioning on the controller’s board is presented
in Fig. 1.
Installation of connected devices (turnstiles, locks, power supply, etc.) is performed according to
the instructions given in technical documents of corresponding devices.
8.2.1 Controller installation
1. Unpack the box and check completeness of package contents according to Sect. 4. Make sure
that the equipment is not mechanically damaged.
2. Determine the place for installation of the controller. Location of the controller should comply
with operating conditions. When choosing a location, make sure that it will be convenient to
perform service maintenance of the controller.
Attention!
Do not install the controller at a distance less than 1 m from a source of electromagnetic
interference.
3. Mark and drill holes in the surface to install the controller and connect cables in accordance
with Fig. 2. Lead the communication cables, power cables and
Ethernet
cables to the location.
Figure 2. Hole marking for controller installation