Operation Manual
30
Work
Procedure
Devices,
instrument,
equipment
Norms and
events
1 External
inspection,
cleaning of
the controller
1.3 Remove dust, dirt, corrosion from the
surface of terminal blocks, jumpers and
fuses.
Rags, flat brush,
grease
There should not
be corrosion and
dirt
1.4 Verify compliance of the denomination
and the condition of the fuses
1.5 Verify connection of external circuits to
terminal blocks of the controller
Screwdriver
It should conform
to the layout of the
external
connections is
loosen. Restore
connection, if the
wire is broken off.
Replace the wire,
if insulation is
damaged
1.6 Tighten the screws on the terminal
blocks where the mount
Screwdriver
Wires and
insulation should
not be damaged
2
Functionality
test
2.1 Check the controller by simulating the
actuation of detectors in accordance with the
resources configuration.
Indication on the
controller
corresponding to
events is on.
Formation of
signals at the
outputs according
to their
configuration.
Table 6. List of maintenance works according to the regulations #2 (checklist #2)
Work
Procedure
Norms and events
1. External
inspection, cleaning
of the controller
1.1 Complete on 1.1-.6 of
checklist
#
1.
2. Functionality test
2.1 Check the operation
under Sect. 11 in accordance
with selected configuration.
Switching on of indication on the controller
according to Sect. 11.2. Forming signal at
relay outputs according to their configuration.
13 TRANSPORTATION AND STORAGE
The controller in the original package should be transported in closed freight containers or in other
closed type cargo transport units.
The storage of the controller is allowed indoors at ambient temperature from -20°C to +40°C and at
relative air humidity up to 98% at +25°C.
Содержание CT/L-14
Страница 1: ...Controller CT L 14 ASSEMBLY AND OPERATION MANUAL...
Страница 2: ...CT L 14 Controller Assembly Operation Manual...
Страница 58: ...www perco com...