Procedure of controller connection
Cables used in installation are mentioned in Table 3. When connecting the controller through the
splitter, proceed as follows:
1. Determine the installation location of the splitter. It is recommended to install the splitter
inside of controller housing (do not install the splitter at a distance of more than 2m away
from the controller).
2. Connect controller
Ethernet
cable to the splitter
Con2
connector.
3. Connect the power supply to
Con3
connector. If necessary OD can be connected to
Con3
connector as well. Connection layout is shown in Fig. 17 (plug for connection to connector
included into splitter delivery set).
Figure 17. Connection layout of the controller through
PoE
-splitter
4. Connect
Ethernet
cable from
Switch
to the splitter
Con1
connector.
5. Connected device will be powered after verification between
Switch
and the splitter.
In case you need to deenergize the controller, it is sufficient to disconnect
Ethernet
cable (from
Switch
) from the splitter
Con1
connector.
Appendix 3. Instruction on connection of the controller for lock-
chamber management
Lock-chamber is intermediate detached space (passage through an OD) which excludes a
possibility of a pass-through without additional verification (visual identification, verification, all the
types of double-check verification etc.) and the person passing through the passageway is locked
inside while being verified. Lock-chamber is provided with two check-points equipped with
operating devices: hereinafter OD1 and OD2. It is possible to enter lock-chamber only if there is
nobody in the zone. While there is a person in the lock-chamber zone, external readers (RC
buttons) are blocked until the person leaves the lock-chamber.
CT/L-14
controller can operate different types of lock-chambers:
1. Two-lock lock-chamber (double-sided locks).
2.
RTD-15, RTD-16, RTD-20
full-height rotor turnstile lock-chamber.
3. Turnstile-and-lock lock-chamber.
4. Two-turnstile lock-chamber.
Attention!
When the controller is connected to an ACS, the full lock-chamber configuration is carried
out by the system software.
To operate this kind of lock-chambers, the controller should be configured according to one of the
web-interface models, which automatically set necessary internal responses and cross links in the
settings of the controller, and also will set associated events.
Содержание CT/L-14
Страница 1: ...Controller CT L 14 ASSEMBLY AND OPERATION MANUAL...
Страница 2: ...CT L 14 Controller Assembly Operation Manual...
Страница 58: ...www perco com...