c) Brazing
The Multi-System requires only copper/copper jointing and the jointing method is explained below.
The use of “hard solder” is essential.
Brazing
a) Brazing work should be carried out such that the final result is directed either downwards or sideways.
An upward direction should be avoided wherever possible. (to prevent leakage)
b) Liquid and gas pipe branches should always be dealt with in the specified way with attention being paid
to the direction of the fitting and its angle. (to prevent oil return or drift) For example see page 75.
c) It is standard working practice to use the nitrogen replacement method when brazing.
Important points
1. Every effort must be made to avoid fire. (Clean area where brazing is to be performed and make sure
that fire fighting equipment and water are ready to hand.)
2. Be careful of burns.
3. Make sure that the gap between the pipe and the joint is correct. (To prevent leaks)
4. Is the pipe adequately supported?
As a rule the gaps between supports for horizontal piping (copper pipe) are as follows:
The copper pipe should not be secured directly by metal brackets.
Copper pipe support spacing
(From HASS 107-1977)
Nominal diameter
20 or less
25~40
50
Maximum gap (m)
1.0
1.5
2.0
Содержание Urban Multi MX1 Series
Страница 34: ...Installation 1 PACD011001G2 PACD011004G3 34 Urban Multi Inverter MX1 Series Ceiling Type CS TM ...
Страница 54: ...Installation 1 PACD011001G2 PACD011004G3 54 Urban Multi Inverter MX1 Series ...
Страница 102: ...Appendix Check Points in Installing UM Series PACD011001G2 PACD011004G3 102 Urban Multi Inverter MX1 Series ...
Страница 103: ...PACD011001G2 PACD011004G3 Appendix Check Points in Installing UM Series Urban Multi Inverter MX1 Series 103 1 ...
Страница 104: ...Appendix Check Points in Installing UM Series PACD011001G2 PACD011004G3 104 Urban Multi Inverter MX1 Series ...