PACD011001G2 / PACD011004G3
Installation 1
Urban Multi Inverter “MX1” Series
33
2. After piping, check to make sure draining flows smoothly.
Open the water inlet lid, add approximately 1000 cc of water gradually and check drainage flow.
WHEN ELECTRIC WIRING WORK IS FINISHED
Check drainage flow during COOL running, explained under “TEST OPERATION”.
WHEN ELECTRIC WIRING WORK IS NOT FINISHED
Remove the electric parts box lid, connect a power supply and remote controller to the terminals.
Next, press the inspection/test operation button “
” on the remote controller. The unit will engage the
test operation mode. Press the operation mode selector button “
” until selecting FAN OPERATION
“
”. Then, press the ON/OFF button “
”. The indoor unit fan and drain pump will start up. Check
that the water has drained from the unit. Press “
” to go back to the first mode.
Содержание Urban Multi MX1 Series
Страница 34: ...Installation 1 PACD011001G2 PACD011004G3 34 Urban Multi Inverter MX1 Series Ceiling Type CS TM ...
Страница 54: ...Installation 1 PACD011001G2 PACD011004G3 54 Urban Multi Inverter MX1 Series ...
Страница 102: ...Appendix Check Points in Installing UM Series PACD011001G2 PACD011004G3 102 Urban Multi Inverter MX1 Series ...
Страница 103: ...PACD011001G2 PACD011004G3 Appendix Check Points in Installing UM Series Urban Multi Inverter MX1 Series 103 1 ...
Страница 104: ...Appendix Check Points in Installing UM Series PACD011001G2 PACD011004G3 104 Urban Multi Inverter MX1 Series ...