Flange Connection
a) The flange sheet surface should be clean and undamaged. (Clean any dirt away with a cloth and check
that there has been no damage.)
b) Coat the flange sheet surface with refrigeration oil (Ester or ether oil) and then insert the packing. (Do
not use SUNISO oil.)
c) Tighten the bolts in opposite corners first to ensure that the connection is true.
Important points
1. Only clean refrigeration/oil should be used to coat the flange. (i.e. free from dirt or water)
2. The correct amount of torque should be applied when tightening the flange bolts.
Standard torques for tightening screws and bolts
ISO hexagonal bolt
[Example]
Order:A
→
C
→
B
→
D
The bolts should be tightened little by
little in the above order such that the
same degree of torque is applied
evenly to each corner.
Class
5.8(5T)
10.9(10T)
Size
kgf-cm ±15%
N-m ±15%
kgf-cm ±15%
N-m ±15%
M8
125
1230
302
2960
M10
257
2520
620
6080
M12
436
4280
1,050
10,300
M16
1,030
10,100
2,480
24,300
M20
2,050
20,100
4,950
48,500
Содержание Urban Multi MX1 Series
Страница 34: ...Installation 1 PACD011001G2 PACD011004G3 34 Urban Multi Inverter MX1 Series Ceiling Type CS TM ...
Страница 54: ...Installation 1 PACD011001G2 PACD011004G3 54 Urban Multi Inverter MX1 Series ...
Страница 102: ...Appendix Check Points in Installing UM Series PACD011001G2 PACD011004G3 102 Urban Multi Inverter MX1 Series ...
Страница 103: ...PACD011001G2 PACD011004G3 Appendix Check Points in Installing UM Series Urban Multi Inverter MX1 Series 103 1 ...
Страница 104: ...Appendix Check Points in Installing UM Series PACD011001G2 PACD011004G3 104 Urban Multi Inverter MX1 Series ...