PACD011001G2 / PACD011004G3
Points to Bear in Mind at the System Design
Urban Multi Inverter “MX1” Series
7
2.2
Striking a Balance between System Installation and General Construction
Work (Comprehensive Flow Chart)
Note:
1. The division of the work should be thoroughly clarified. (This applies particularly to work relating to the
connection of control wiring, fitting of remote controller and central control panel, boundary work on
areas such as connection of drain piping and humidification supply piping, inspection and foundation)
2. Keep a constant check on the progress of the construction work to avoid deviations from the air
conditioning work schedule.
3. For sleeve and insert work the positions of ceiling girders should be confirmed and sleeve and insert
requirement, hole diameters, positioning and numbers decided. This is particularly important in the case
of sleeves for drain piping.
Содержание Urban Multi MX1 Series
Страница 34: ...Installation 1 PACD011001G2 PACD011004G3 34 Urban Multi Inverter MX1 Series Ceiling Type CS TM ...
Страница 54: ...Installation 1 PACD011001G2 PACD011004G3 54 Urban Multi Inverter MX1 Series ...
Страница 102: ...Appendix Check Points in Installing UM Series PACD011001G2 PACD011004G3 102 Urban Multi Inverter MX1 Series ...
Страница 103: ...PACD011001G2 PACD011004G3 Appendix Check Points in Installing UM Series Urban Multi Inverter MX1 Series 103 1 ...
Страница 104: ...Appendix Check Points in Installing UM Series PACD011001G2 PACD011004G3 104 Urban Multi Inverter MX1 Series ...