Installation 1
PACD011001G2 / PACD011004G3
28
Urban Multi Inverter “MX1” Series
WHEN ELECTRIC WIRING WORK IS FINISHED
Check drainage flow during COOL running, explained under “TEST OPERATION”.
WHEN ELECTRIC WIRING WORK IS NOT FINISHED
Remove the electric parts box lid, connect a power supply and remote controller to the terminals.
Next, press the inspection/test operation button “
” on the remote controller. The unit will engage the
test operation mode. Press the operation mode selector button “
” until selecting FAN OPERATION
“
”. Then, press the ON/OFF button “
”. The indoor unit fan and drain pump will start up. Check
that the water has drained from the unit. Press “
” to go back to the first mode.
Note that the fan also starts rotating.
Corner Type
(CS-DM)
1. Install the drain pipes.
Keep piping as short as possible and slope it downwards so that air may not remained trapped inside
the pipe.
Keep pipe size equal to or greater than that of the connecting pipe (Vinyl pipe of 25 mm nominal diam.
and 32 mm outer diam.).
Use the attached drain hose and clamp. Tighten the clamp firmly.
Insulate the clamp with the attached sealing pad.
Insulate the drain hose inside the building.
[Method of adding water]
Switch box
cover (1)
Switch box
cover (2)
Terminal board for
remote control (6P)
Lead cable for remote control
Power supply
Power supply
terminal board (2P)
3PA60996-10L
L
N
P1 P2 F1 F2
T1
T2
Содержание Urban Multi MX1 Series
Страница 34: ...Installation 1 PACD011001G2 PACD011004G3 34 Urban Multi Inverter MX1 Series Ceiling Type CS TM ...
Страница 54: ...Installation 1 PACD011001G2 PACD011004G3 54 Urban Multi Inverter MX1 Series ...
Страница 102: ...Appendix Check Points in Installing UM Series PACD011001G2 PACD011004G3 102 Urban Multi Inverter MX1 Series ...
Страница 103: ...PACD011001G2 PACD011004G3 Appendix Check Points in Installing UM Series Urban Multi Inverter MX1 Series 103 1 ...
Страница 104: ...Appendix Check Points in Installing UM Series PACD011001G2 PACD011004G3 104 Urban Multi Inverter MX1 Series ...