209
Maintenance settings
Setting
The “Test run” screen
A: Select the line numbers of the outdoor
units you want to run a test operation
for. The “Line No.” dialogue is displayed
when you touch this.
B: Set the link system of the outdoor units
you want to run a test operation for. The
“Link” dialogue is displayed when you
touch this.
C: Outdoor units are displayed in a list.
Item
Explanation
Slct
Select the outdoor units you want
to run a test operation for.
O/D unit The outdoor units in the linked
system selected at B are
displayed.
Stus
The operation mode while testing
operation is displayed.
D: The indoor units that are connected to
outdoor units with a check mark in C are
displayed.
E: Test operation is performed. The operation dialogue is displayed when you touch this.
B
A
C
D
E
Running a test operation