
4
Initial commissioning
26
6924-en_V1.3_09/20
1
2
3
4
Connections on back of Promo 1000
1 Control lines “MFC sample
flow,” “sample flow switch” and
“MFC gen”
2 Control line “diff pressure”
3 LAN cable, connection to PC
4 Power cable
The control lines from inside of the test rig are labeled. Connect the lines to
the corresponding sockets on the back of the
Promo 1000
.