SECTION 3 – MACHINE CONTROLS, INDICATORS AND OPERATION
3-20
– JLG Lift–
1.
Open the access door to the pump/motor assembly.
2.
Fully unscrew the rotary valve.
3.
Lift the folding lever. Push on top of the pinion to
engage it in the turntable bearing teeth. Turn the lever
clockwise to swing the structure to the right or turn
the lever counter-clockwise to swing the structure to
the left.
4.
When finished swinging, fold back the lever until it is
latched. Fully screw in the rotary valve.
NEVER LEAVE THE MACHINE WITH THE LEVER UNFOLDED OR WITH THE
ROTARY VALVE UNSCREWED.
To
order
go
to
Discount-Equipment.com