![Oshkosh Corporation JLG TOUCAN 10E Скачать руководство пользователя страница 34](http://html1.mh-extra.com/html/oshkosh-corporation/jlg-toucan-10e/jlg-toucan-10e_operation-and-safety-manual_1655759034.webp)
SECTION 2 – USER RESPONSIBILITIES, MACHINE PREPARATION, AND INSPECTION
– JLG Lift –
2-5
2.4
DAILY WALK-AROUND INSPECTION
Begin the “Walk-Around Inspection” at Item 1, see Figure 2-1. or
Figure 2-2. depending on model. Continue checking each item in
sequence for the conditions listed in the following checklist.
TO AVOID POSSIBLE INJURY, BE SURE MACHINE POWER IS OFF. DO NOT OPERATE
MACHINE UNTIL ALL MALFUNCTIONS HAVE BEEN CORRECTED.
INSPECTION NOTE
: On all components, make sure there are no
loose or missing parts, that they are securely fastened, and no visible
damage, leaks or excessive wear exists in addition to any other crite
-
ria mentioned.
1. Platform Assembly
and Gate
- Gate opens and closes
properly, manual in storage container. See inspection
note.
2. Ground Control Console
- Placards secure and legi
-
ble, control switches return to neutral position and
emergency stop switches function properly. Control
markings legible.
3. Platform Control Console
- Ensure that the control
console is firmly secured in the proper location. Plac
-
ards secure and legible, control lever and switches
return to neutral position and emergency stop switch
functions properly.
4. Steering Assembly
- See inspection note.
5. Wheel/Tire Assemblies
- Properly secured, no miss
-
ing lug nuts. Inspect for worn tread, cuts, tears or other
discrepancies. Inspect wheels for damage and corro
-
sion. See inspection note.
6. Hood Assemblies
- See Inspection Note.
7. Hydraulic Cylinders
- No visible damage, pivot pins
and hydraulic hoses undamaged, no leakage (hose
connections - valve block).
8. Manual Controls -
See Inspection Note.
9. Lifting Chains, Chain Yokes and Clevis Pins
- Must
be installed and in good condition. Chains must be
correctly tensioned and lubricated.
10. Hydraulic Pump/Motor, Control Valves Installation/
Oil Level in Reservoir -
Swing needle valve fully
closed. No unsupported wires or hoses; no damaged
or broken wires. See Inspection Note.
11. Limit Switches
- Mast limit switch(es), chain slack limit
switches and overload sensor are properly installed
and fastened. See inspection note.
To
order
go
to
Discount-Equipment.com