SECTION 5 – GENERAL SPECIFICATIONS AND MAINTENANCE
– JLG Lift –
5-43
5.13 TILT SENSOR VERIFICATION
Interval - At least every 6 months of operation.
1.
Drive the machine on a known level surface.
2.
Chock both rear wheels.
3.
Remove chassis hoods and place a level on the chassis
positioned in line w/chassis.
4.
Using a jack of appropriate capacity, lift the front on
the chassis. The tilt alarm must be activated within 0.2°
below the value in Table 5-1.
5.
Place the spirit level perpendicular to the chassis and
lift either the left or the right side of the chassis. The
tilt alarm must be activated within 0.2° below the
value in Table 5-1.
6.
If the tilt warning is not activated within the indicated
angle values, the tilt sensor must be recalibrated by a
qualified technician before placing machine into ser
-
vice.
Figure 5-26. Jacking Points
To
order
go
to
Discount-Equipment.com