iv
SPARC M5-32 and SPARC M6-32 Servers Installation Guide • December 2014
24
Leveling Feet and Caster Dimensions
Raised Floor Weight Considerations
Mounting Holes and Cable Routing Floor Cutout Specifications
Reviewing the Power Requirements
30
31
36
37
Power Cord-to-Power Supply Relationship
40
42
Circuit Breaker Capacity Requirements
43
45
Heat Dissipation and Airflow Requirements
Cooling Airflow From Ceiling Vents
Cooling Airflow From Perforated Floor Tiles
▼
Measure the Ambient Temperature and Humidity
Preparing the Unloading Route and Unpacking Area
Loading Dock and Receiving Area Requirements
57
59
Mandatory Cable Connections and Network Addresses
59
Содержание sparc M5-32
Страница 1: ...SPARC M5 32 and SPARC M6 32 Servers Installation Guide Part No E41215 05 December 2014 ...
Страница 8: ...viii SPARC M5 32 and SPARC M6 32 Servers Installation Guide December 2014 ...
Страница 16: ...6 SPARC M5 32 and SPARC M6 32 Servers Installation Guide December 2014 Front Components ...
Страница 18: ...8 SPARC M5 32 and SPARC M6 32 Servers Installation Guide December 2014 Rear Components ...
Страница 21: ...Understanding the Server 11 FIGURE DCU Locations Rear of Server ...
Страница 43: ...Preparing the Site 33 FIGURE 4 Wire Power Cord AC Plug 460P9W Figure Legend 1 L1 2 L2 3 L3 4 Ground ...
Страница 51: ...Preparing the Site 41 ...
Страница 82: ...72 SPARC M5 32 and SPARC M6 32 Servers Installation Guide December 2014 ...
Страница 106: ...96 SPARC M5 32 and SPARC M6 32 Servers Installation Guide December 2014 ...
Страница 182: ...172 SPARC M5 32 and SPARC M6 32 Servers Installation Guide December 2014 ...