Preparing the Site
57
■
“Handling Precautions” on page 67
■
“Moving the Server” on page 78
Unpacking Area
Prior to unpacking the server from its shipping container, ensure that you have
provided enough space to unpack the server. Refer to the
Unpacking Guide
, which is
attached to the shipping carton, for the unpacking instructions.
Caution –
You must provide 10 ft (3 m) as a stopping zone to slow and stop the
server after it rolls down the shipping pallet ramps. Failure to provide this stopping
zone could lead to equipment damage or serious physical injury.
Note –
Remove the shipping container in a conditioned space away from the final
installation site to reduce airborne particles entering the data center.
Содержание sparc M5-32
Страница 1: ...SPARC M5 32 and SPARC M6 32 Servers Installation Guide Part No E41215 05 December 2014 ...
Страница 8: ...viii SPARC M5 32 and SPARC M6 32 Servers Installation Guide December 2014 ...
Страница 16: ...6 SPARC M5 32 and SPARC M6 32 Servers Installation Guide December 2014 Front Components ...
Страница 18: ...8 SPARC M5 32 and SPARC M6 32 Servers Installation Guide December 2014 Rear Components ...
Страница 21: ...Understanding the Server 11 FIGURE DCU Locations Rear of Server ...
Страница 43: ...Preparing the Site 33 FIGURE 4 Wire Power Cord AC Plug 460P9W Figure Legend 1 L1 2 L2 3 L3 4 Ground ...
Страница 51: ...Preparing the Site 41 ...
Страница 82: ...72 SPARC M5 32 and SPARC M6 32 Servers Installation Guide December 2014 ...
Страница 106: ...96 SPARC M5 32 and SPARC M6 32 Servers Installation Guide December 2014 ...
Страница 182: ...172 SPARC M5 32 and SPARC M6 32 Servers Installation Guide December 2014 ...