Preparing the Site
25
Installation and Service Area
Prior to installing the server, prepare a service area that provides enough room to
install and service the server.
Caution –
You must provide the following service area for the server. Do not
attempt to operate the server in a smaller service area.
Note –
The length between the two door pivot points is 56.5 in (1435 mm). The
depth of the server without doors is 53.6 in. (1362 mm).
When turning the server, temporarily provide additional space in front or rear of the
installation site beyond the minimum aisle width. The server requires at least 70 in.
(1.78m) of space to turn.
1
Front of server
2
Rear of server
Содержание sparc M5-32
Страница 1: ...SPARC M5 32 and SPARC M6 32 Servers Installation Guide Part No E41215 05 December 2014 ...
Страница 8: ...viii SPARC M5 32 and SPARC M6 32 Servers Installation Guide December 2014 ...
Страница 16: ...6 SPARC M5 32 and SPARC M6 32 Servers Installation Guide December 2014 Front Components ...
Страница 18: ...8 SPARC M5 32 and SPARC M6 32 Servers Installation Guide December 2014 Rear Components ...
Страница 21: ...Understanding the Server 11 FIGURE DCU Locations Rear of Server ...
Страница 43: ...Preparing the Site 33 FIGURE 4 Wire Power Cord AC Plug 460P9W Figure Legend 1 L1 2 L2 3 L3 4 Ground ...
Страница 51: ...Preparing the Site 41 ...
Страница 82: ...72 SPARC M5 32 and SPARC M6 32 Servers Installation Guide December 2014 ...
Страница 106: ...96 SPARC M5 32 and SPARC M6 32 Servers Installation Guide December 2014 ...
Страница 182: ...172 SPARC M5 32 and SPARC M6 32 Servers Installation Guide December 2014 ...