Installing the Server
89
Related Information
■
“Leveling Feet and Caster Dimensions” on page 26
■
“Install the Mounting Brackets” on page 91
▼
Raise the Leveling Feet
Before moving or repositioning the server, make sure that you raise all four leveling
feet.
Note –
The leveling feet must remain securely down on the floor at the installation
site. Only raise the leveling feet before moving the server.
1. Open the server doors.
2. Use a 19-mm wrench to loosen the 19-mm locking nuts located at the top of each
leveling foot.
Turn the wrench clockwise to loosen the 19-mm locking nuts.
Содержание sparc M5-32
Страница 1: ...SPARC M5 32 and SPARC M6 32 Servers Installation Guide Part No E41215 05 December 2014 ...
Страница 8: ...viii SPARC M5 32 and SPARC M6 32 Servers Installation Guide December 2014 ...
Страница 16: ...6 SPARC M5 32 and SPARC M6 32 Servers Installation Guide December 2014 Front Components ...
Страница 18: ...8 SPARC M5 32 and SPARC M6 32 Servers Installation Guide December 2014 Rear Components ...
Страница 21: ...Understanding the Server 11 FIGURE DCU Locations Rear of Server ...
Страница 43: ...Preparing the Site 33 FIGURE 4 Wire Power Cord AC Plug 460P9W Figure Legend 1 L1 2 L2 3 L3 4 Ground ...
Страница 51: ...Preparing the Site 41 ...
Страница 82: ...72 SPARC M5 32 and SPARC M6 32 Servers Installation Guide December 2014 ...
Страница 106: ...96 SPARC M5 32 and SPARC M6 32 Servers Installation Guide December 2014 ...
Страница 182: ...172 SPARC M5 32 and SPARC M6 32 Servers Installation Guide December 2014 ...