124
SPARC M5-32 and SPARC M6-32 Servers Installation Guide • December 2014
2. Determine if you will be routing the power cords up through the top of the
server, or down through the floor.
■
If routing the power cords downward, leave the right cable bracket as is. Skip
to
.
■
If routing the power cords upward, remove the right cable bracket as described
in the following steps.
3. Use a T20 Torx screwdriver to remove the three M4X10 screws securing the right
cable bracket.
Remove the right cable bracket from the server, and store the bracket and screws
in a safe location.
4. Determine if you will be routing the data cables up through the top of the
server or down through the floor.
■
If routing the data cables upward, leave the left cable bracket as is and skip to
.
■
If routing the data cables downward, continue to the next step to reposition the
left cable bracket.
Содержание sparc M5-32
Страница 1: ...SPARC M5 32 and SPARC M6 32 Servers Installation Guide Part No E41215 05 December 2014 ...
Страница 8: ...viii SPARC M5 32 and SPARC M6 32 Servers Installation Guide December 2014 ...
Страница 16: ...6 SPARC M5 32 and SPARC M6 32 Servers Installation Guide December 2014 Front Components ...
Страница 18: ...8 SPARC M5 32 and SPARC M6 32 Servers Installation Guide December 2014 Rear Components ...
Страница 21: ...Understanding the Server 11 FIGURE DCU Locations Rear of Server ...
Страница 43: ...Preparing the Site 33 FIGURE 4 Wire Power Cord AC Plug 460P9W Figure Legend 1 L1 2 L2 3 L3 4 Ground ...
Страница 51: ...Preparing the Site 41 ...
Страница 82: ...72 SPARC M5 32 and SPARC M6 32 Servers Installation Guide December 2014 ...
Страница 106: ...96 SPARC M5 32 and SPARC M6 32 Servers Installation Guide December 2014 ...
Страница 182: ...172 SPARC M5 32 and SPARC M6 32 Servers Installation Guide December 2014 ...