114
SPARC M5-32 and SPARC M6-32 Servers Installation Guide • December 2014
8. Route the SP cables out the top of the server, and secure the cables to a cable
tray or a cable management device above the server.
9. (Optional) Use tie wraps and adhesive cable-tie mounts to secure the SP cables
to the inside edges of the left and right trim panels.
By securing the SP cables to the trim panels, the cables will not interfere with the
front fan modules.
10. Continue with the installation by installing the front door.
See
“Install the Door” on page 115
Related Information
■
“Connect the SP Cables” on page 97
■
“Route the SP Cables Down” on page 102
■
Содержание sparc M5-32
Страница 1: ...SPARC M5 32 and SPARC M6 32 Servers Installation Guide Part No E41215 05 December 2014 ...
Страница 8: ...viii SPARC M5 32 and SPARC M6 32 Servers Installation Guide December 2014 ...
Страница 16: ...6 SPARC M5 32 and SPARC M6 32 Servers Installation Guide December 2014 Front Components ...
Страница 18: ...8 SPARC M5 32 and SPARC M6 32 Servers Installation Guide December 2014 Rear Components ...
Страница 21: ...Understanding the Server 11 FIGURE DCU Locations Rear of Server ...
Страница 43: ...Preparing the Site 33 FIGURE 4 Wire Power Cord AC Plug 460P9W Figure Legend 1 L1 2 L2 3 L3 4 Ground ...
Страница 51: ...Preparing the Site 41 ...
Страница 82: ...72 SPARC M5 32 and SPARC M6 32 Servers Installation Guide December 2014 ...
Страница 106: ...96 SPARC M5 32 and SPARC M6 32 Servers Installation Guide December 2014 ...
Страница 182: ...172 SPARC M5 32 and SPARC M6 32 Servers Installation Guide December 2014 ...