SPARC M5-32 and SPARC M6-32 Servers Installation Guide • December 2014
■
“Heat Dissipation and Airflow Requirements” on page 47
■
“Cooling Airflow From Ceiling Vents” on page 49
■
“Cooling Airflow From Perforated Floor Tiles” on page 50
■
“Measure the Ambient Temperature and Humidity” on page 52
Related Information
■
“Reviewing the Physical Specifications” on page 23
■
“Preparing for Installation” on page 67
■
“Confirm the Site Preparation” on page 73
Environmental Requirements
Requirement
Operating Range
Nonoperating Range
Optimum Range
Ambient
temperature
5˚ to 35˚C (41˚ to 95˚F)
Note -
Temperature ramp rate must
not exceed 15˚C (27˚F) per hour.
In shipping container: -40˚ to 65˚C
(-40˚ to 149˚F)
Unpacked: 0˚ to 50˚C (32˚ to 122˚F)
Note -
Temperature ramp rate must
not exceed 20˚C (36˚F) per hour.
21˚ to 23˚C
(70˚ to 74˚F)
Relative
humidity
20% to 80%, 27˚C (81˚F) max wet bulb
temperature, noncondensing.
Note -
Humidity ramp rate must not
exceed 30% per hour.
Up to 93%, 38˚C (100.4˚F) max wet
bulb temperature, noncondensing.
Note -
Humidity ramp rate must not
exceed 20% per hour.
45% to 50%
Altitude
Up to 3000m (10000 ft)
Note -
Except in China markets where
regulations might limit installations to
a maximum altitude of 2 km (6560 ft.).
Up to 12000m (40000 ft)
Temperature
ranges
5˚ to 35˚C (41˚ to 95˚F) at
0 to 500m (0 to 1640 ft)
5˚ to 33˚C (41˚ to 93.2˚F) at
501 to 1000m (1664 to 3281 ft)
5˚ to 31˚C (41˚ to 87.7˚F) at
1001 to 1500m (3284 ft to 4921 ft)
5˚ to 29˚C (41˚ to 84.2˚F) at
1501 to 3000m (4924 to 10000 ft)
Note -
Except in China markets where
regulations might limit installations to
a maximum altitude of 2km (6560 ft.).
Содержание sparc M5-32
Страница 1: ...SPARC M5 32 and SPARC M6 32 Servers Installation Guide Part No E41215 05 December 2014 ...
Страница 8: ...viii SPARC M5 32 and SPARC M6 32 Servers Installation Guide December 2014 ...
Страница 16: ...6 SPARC M5 32 and SPARC M6 32 Servers Installation Guide December 2014 Front Components ...
Страница 18: ...8 SPARC M5 32 and SPARC M6 32 Servers Installation Guide December 2014 Rear Components ...
Страница 21: ...Understanding the Server 11 FIGURE DCU Locations Rear of Server ...
Страница 43: ...Preparing the Site 33 FIGURE 4 Wire Power Cord AC Plug 460P9W Figure Legend 1 L1 2 L2 3 L3 4 Ground ...
Страница 51: ...Preparing the Site 41 ...
Страница 82: ...72 SPARC M5 32 and SPARC M6 32 Servers Installation Guide December 2014 ...
Страница 106: ...96 SPARC M5 32 and SPARC M6 32 Servers Installation Guide December 2014 ...
Страница 182: ...172 SPARC M5 32 and SPARC M6 32 Servers Installation Guide December 2014 ...