Preparing the Site
59
Planning Network Addresses
Related Information
■
“Connecting the Front SP Cables” on page 97
■
“Connect the EMS Network Cables” on page 134
■
“Log In to the Active SP” on page 148
Mandatory Cable Connections and Network
Addresses
These cable connections and network addresses are required when first installing the
server. Depending on your hardware and software configuration, the server might
require additional cable connections and network addresses.
Description
Link
Review the list of cable connections
and network addresses required
during the initial installation.
“Mandatory Cable Connections and Network
Addresses” on page 59
Provide network addresses to the
service processor components.
“SP Cables” on page 60
“SP Network Addresses” on page 64
Provide network addresses to the
network cables connected to each
PDomain in the server.
“PDomain Cables and Network Addresses” on
page 65
“PCIe Network Interface Cards” on page 65
Provide network addresses to the
Oracle VM Server for SPARC logical
domains.
Содержание sparc M5-32
Страница 1: ...SPARC M5 32 and SPARC M6 32 Servers Installation Guide Part No E41215 05 December 2014 ...
Страница 8: ...viii SPARC M5 32 and SPARC M6 32 Servers Installation Guide December 2014 ...
Страница 16: ...6 SPARC M5 32 and SPARC M6 32 Servers Installation Guide December 2014 Front Components ...
Страница 18: ...8 SPARC M5 32 and SPARC M6 32 Servers Installation Guide December 2014 Rear Components ...
Страница 21: ...Understanding the Server 11 FIGURE DCU Locations Rear of Server ...
Страница 43: ...Preparing the Site 33 FIGURE 4 Wire Power Cord AC Plug 460P9W Figure Legend 1 L1 2 L2 3 L3 4 Ground ...
Страница 51: ...Preparing the Site 41 ...
Страница 82: ...72 SPARC M5 32 and SPARC M6 32 Servers Installation Guide December 2014 ...
Страница 106: ...96 SPARC M5 32 and SPARC M6 32 Servers Installation Guide December 2014 ...
Страница 182: ...172 SPARC M5 32 and SPARC M6 32 Servers Installation Guide December 2014 ...