SIEPCYEUOQ2V01A Q2V Technical Manual
113
4.5
Start-up Procedures
This section gives the basic steps necessary to start up the drive.
Use the flowcharts in this section to find the most applicable start-up method for your application.
This section gives information about only the most basic settings.
◆
Flowchart A: Connect and Run the Motor with Minimal Setting Changes
Flowchart A shows a basic start-up sequence to connect and run a motor with a minimum of setting changes.
Settings can change when the application changes.
Use the drive default parameter settings for basic applications where high precision is not necessary.
Figure 4.9 Basic Steps before Startup
Fine tune parameters. Adjust application settings if necessary.
Check he machine operation and use the Verify function to
check the parameter settings.
Drive is ready to run the application.
0: V/f Control
2: Open Loop Vector Control
5: Open Loop Vector Control
for PM
6: PM Advanced Open Loop
Vector Control
To
sub-chart
A-2
To
sub-chart
A-1
8: EZ Open
Loop Vector Control
Induction motor and
PM motor
PM motor
Induction
motor
To
sub-chart
A-3
From sub-charts A-1, A-2, A-3
Perform no-load test-run. Make sure the machine operation, direction of
motor rotation, and functioning of multi-functional input/output is correct.
Operate with an actual load. Make sure that
the machine operates as you have set.
Set A1-02 [Control Method Selection].
Start
Check before Energizing Drive
Check after Energizing Drive
Installation and Wiring
Control Method Selection
A1-02 =
Set the basic parameters.
- Set b1-02 [Run Command Selection] and b1-01 [Frequency Reference Selection]
- Set parameter H1, H2, H3, H4, or H6 to I/O functions
- Set d1-xx when you use multi-step speed
- Set C1-xx and C2-xx for accel/decel time and S-curve characteristics
- Set C6-01 to Heavy duty or Normal duty
- Set L3-04 when you use braking resistors or braking transistors
Содержание Q2V Series
Страница 2: ...This Page Intentionally Blank 2 SIEPCYEUOQ2V01A Q2V Technical Manual...
Страница 12: ...12 SIEPCYEUOQ2V01A Q2V Technical Manual...
Страница 18: ...i 2 Legal Information 18 SIEPCYEUOQ2V01A Q2V Technical Manual...
Страница 26: ...1 2 Features and Advantages of Control Methods 26 SIEPCYEUOQ2V01A Q2V Technical Manual...
Страница 38: ...2 8 Installation Methods 38 SIEPCYEUOQ2V01A Q2V Technical Manual...
Страница 70: ...3 3 Main Circuit Wiring 70 SIEPCYEUOQ2V01A Q2V Technical Manual Models B006 B012...
Страница 102: ...3 17 Motor Application Precautions 102 SIEPCYEUOQ2V01A Q2V Technical Manual...
Страница 138: ...4 12 Test Run Checklist 138 SIEPCYEUOQ2V01A Q2V Technical Manual...
Страница 143: ...Standards Compliance 5 5 2 European Standards SIEPCYEUOQ2V01A Q2V Technical Manual 143 EU Declaration of Conformity...
Страница 144: ...5 2 European Standards 144 SIEPCYEUOQ2V01A Q2V Technical Manual...
Страница 145: ...Standards Compliance 5 5 2 European Standards SIEPCYEUOQ2V01A Q2V Technical Manual 145...
Страница 146: ...5 2 European Standards 146 SIEPCYEUOQ2V01A Q2V Technical Manual...
Страница 266: ...7 10 Troubleshooting Without Fault Display 266 SIEPCYEUOQ2V01A Q2V Technical Manual...
Страница 284: ...8 6 Storage Guidelines 284 SIEPCYEUOQ2V01A Q2V Technical Manual...
Страница 312: ...10 10 Peripheral Devices and Options 312 SIEPCYEUOQ2V01A Q2V Technical Manual...
Страница 430: ...11 21 Parameters Changed by PM Motor Code Selection 430 SIEPCYEUOQ2V01A Q2V Technical Manual...
Страница 731: ...SIEPCYEUOQ2V01A Q2V Technical Manual 731 Z Z pulse Auto Tuning 125...
Страница 733: ...SIEPCYEUOQ2V01A Q2V Technical Manual 733...