42
LD Cart Transporter User's Manual
14766-000 Rev H
3.3 Unpacking
Figure 3-3. Spring-loaded Latch
2. Remove the front panel, and set it aside.
This will be used as a ramp, to roll the platform off of the crate base.
Removing the Upper Body of the Crate
1. There are six lag bolts and washers around the base of the crate, two in the rear and
two on each side. Remove all six lag bolts and washers.
Figure 3-4. Crate Lag Bolts
2. Slide the upper body of the crate off of the base.
Take care as you slide it over the HMI post, watching the clearance between the crate
and the HMI post components.
The platform will still be held securely by the base of the crate.