![background image](http://html1.mh-extra.com/html/omron/cx-motion-ncf-v1-8/cx-motion-ncf-v1-8_operation-manual_744181073.webp)
52
Downloading Data
Section 7-3
7-3
Downloading Data
The object of downloading varies depending on the operation method.
Batch Downloading
Downloads Unit Parameters and Servo Parameters of all the Servo Drives
registered in the Axis Map Setting Window.
Downloading Unit
Parameters
Downloads Unit Parameters.
Downloading Servo
Parameters
Downloads Servo Parameters.
Note
Before starting MECHATROLINK communications, make sure that the PLC is
in the PROGRAM Mode. Otherwise, the axis may start moving suddenly due
to the ladder execution.
Before disconnecting MECHATROLINK communications, make sure that the
axis is not operating. Disconnecting MECHATROLINK communications will
put the operating axis in the Servo Free state.
Before restarting the Position Control Unit, make sure that the axis is not oper-
ating. Restarting the Position Control Unit will put the operating axis in the
Servo Free state.
7-3-1
Batch Downloading
1,2,3...
1.
In the Axis Map Setting Window, select
Online - Download to NC Unit
,
click
in the toolbar, or right-click a Position Control Unit and select
Download to NC Unit
from the pop-up menu.
2.
Click the
OK
Button.
Cancels all the parameters being edited and closes the Edit Windows.
Содержание CX-MOTION-NCF - V1.8
Страница 2: ...CXONE AL C V3 CXONE AL D V3 CX Motion NCF Ver 1 8 Operation Manual Revised October 2008...
Страница 3: ...iv...
Страница 5: ...vi...
Страница 21: ...xxii Application Precautions 5...
Страница 33: ...12 Connecting to PLC Section 2 2...
Страница 36: ...15 Screen Name Section 3 1 Edit Parameter Windows...
Страница 37: ...16 Screen Name Section 3 1 Monitor Windows Axis Monitor Window Unit Monitor Window...
Страница 63: ...42 Editing Servo Parameters Section 5 2...
Страница 68: ...47 Print Section 6 5 Print Samples An example of printed Unit Parameters is shown below...
Страница 89: ...68 Writing to Flash Memory Section 7 6...
Страница 95: ...74 Axis Monitor Section 8 2 2 Click the OK Button to start communications i e establish connection...
Страница 103: ...82 Axis Monitor Section 8 2...
Страница 104: ...83 SECTION 9 Test Run Operation This section describes the test run operations for each axis 9 1 Test Run 84...
Страница 109: ...88 Test Run Section 9 1...
Страница 133: ...112 Index...
Страница 137: ...116 Revision History...