![background image](http://html1.mh-extra.com/html/omron/cx-integrator-v1-1/cx-integrator-v1-1_operation-manual_744178324.webp)
9-2
Echoback Test between Nodes
9-2-4
Executing an Echoback Test between Nodes
Field
Input
Contents
Success
Displays the number of test successes. If set for “Frequency
is not specified,” a “-“ is displayed.
Test Results
Failure
Displays the number of test failures. The test is ended when
1,000 failures is reached.
Max (ms)
Displays the maximum response time.
Min (ms)
Displays the minimum response time.
Response time
Average (ms)
Displays the average response time. If set for “Frequency is
not specified,” the display shows the average for the last ten
times.
9-2-4
Executing an Echoback Test between Nodes
1. While online, open the Online Connection Information Window, right-click the target
PLC or Unit, and select
Echoback test between PLC nodes
from the pop-up
menu.
The PLC Internode Echoback Test Dialog Box will be displayed.
2. Input (or confirm) the target item, and click the
Connect
Button.
The connection results will be displayed.
9-23
Содержание CX-INTEGRATOR - V1.1
Страница 1: ...OPERATION MANUAL CX Integrator Ver 1 1 SYSMAC CXONE AL C E Cat No W445 E1 02...
Страница 2: ...CXONE AL C E CX Integrator Ver 1 1 Operation Manual Revised November 2005...
Страница 3: ...iv...
Страница 5: ...vi...
Страница 13: ...xiv...
Страница 120: ...Communications Section 3 Routing Tables This section describes how to set the routing tables 3...
Страница 200: ...Communications Section 5 Ethernet This section describes the operations specific to Ethernet 5...
Страница 292: ...Communications Section 8 NT Links This section explains the settings and operations specific to the NT Link system 8...
Страница 328: ...Appendices A...
Страница 336: ......