8-2
Transferring Screen Data through the PLC
8-2-2 Procedure
10. Right-click the icon of the NS-series PT in the Network Configuration Window and
select
Start Special Application – Start with Settings Inherited
.
CX-Designer will start and a dialog box will be displayed for selecting the project.
11. Click the
New Project
Button. The NS-series PT model and version will be
inherited, and the New Project Dialog Box will be displayed.
12. Click the
OK
Button to create the new screen data. The created screen data will
be created in a project file (.ipp extension) for transfer to the NS-series PT.
13. To transfer the screen data to the NS-series PT, select either
Quick Transfer [To
PT]
or
Transfer [To PT]
from the PT menu. The following dialog box will be
displayed for confirmation.
8-9
Содержание CX-INTEGRATOR - V1.1
Страница 1: ...OPERATION MANUAL CX Integrator Ver 1 1 SYSMAC CXONE AL C E Cat No W445 E1 02...
Страница 2: ...CXONE AL C E CX Integrator Ver 1 1 Operation Manual Revised November 2005...
Страница 3: ...iv...
Страница 5: ...vi...
Страница 13: ...xiv...
Страница 120: ...Communications Section 3 Routing Tables This section describes how to set the routing tables 3...
Страница 200: ...Communications Section 5 Ethernet This section describes the operations specific to Ethernet 5...
Страница 292: ...Communications Section 8 NT Links This section explains the settings and operations specific to the NT Link system 8...
Страница 328: ...Appendices A...
Страница 336: ......