Page: 76
Service Guide OF1000
Chapter 3 Maintenance & Disassembly
3.2.10 Hook Switch Board (Hook-SW)
1. Perform these procedures:
3.2.01
3.2.09
2. Remove the two screws (1).
3. Detach the two cables (2).
4. Remove the hook switch board (3).
P/N N/A Screw
RSPL B.2.01
P/N 56629209 Cable: NCU-Hook
B.2.16
P/N 56628505 Cable: MCNT-Hook (2 Pin)
B.2.16
P/N 55074002 PCB: Hook Switch RSPL
RSPL B.2.01
P/N 51709801 Insulator: Hook Switch
RSPL B.2.01
Содержание OF1000
Страница 146: ...Partner Exchange BPX for any updates to this material http bpx okidata com...
Страница 185: ...Partner Exchange BPX for any updates to this material http bpx okidata com...
Страница 208: ...Partner Exchange BPX for any updates to this material http bpx okidata com...
Страница 260: ...Partner Exchange BPX for any updates to this material http bpx okidata com...
Страница 276: ...Page 182 Service Guide OF1000 Chapter 4 Failure Repair Analysis Sample Analysis of Protocol Dump Data...