
Chapter 37 Hardware procedures 421
Passport 7400 Hardware Installation, Maintenance, and Upgrade 5.2S1
Table 12
Equipment checklist for unpacking a 16-slot Passport switch
Equipment
Switch shelving (for one or two switches, depending on your
installation)
Cooling unit chassis
Cooling unit and air filter
Cooling unit cables
Shelf assembly ground cables
Cable management assembly
Power supplies (up to 3)
Blank power supply (3 less the number of power supplies)
Control processors (1 or 2)
Function processors (up to 15)
Function processor cables (as required)
Blank processor cards (14 for each switch less the number of
processors)
Termination panels (as required)
Grounding cable for termination panels
Grounding strips for termination panels (1 for each panel)
Power cords (1 for each power supply)
Power cord selector guide
Antistatic wrist strap
Содержание Passport 7400
Страница 1: ...Passport 7400 Hardware Installation Maintenance and Upgrade 241 7401 240 ...
Страница 2: ......
Страница 4: ......
Страница 6: ...6 Publication history 241 7401 240 5 2S1 ...
Страница 28: ...28 About this document 241 7401 240 5 2S1 ...
Страница 32: ...32 Chapter 1 3 slot Passport switch installation 241 7401 240 5 2S1 ...
Страница 42: ...42 Chapter 3 5 slot Passport switch installation 241 7401 240 5 2S1 ...
Страница 60: ...60 Chapter 5 16 slot Passport switch installation 241 7401 240 5 2S1 ...
Страница 66: ...66 Chapter 6 16 slot Passport switch shelf replacement 241 7401 240 5 2S1 ...
Страница 74: ...74 Chapter 9 Alarm hardware replacement 241 7401 240 5 2S1 ...
Страница 80: ...80 Chapter 11 BITS termination panel replacement 241 7401 240 5 2S1 ...
Страница 84: ...84 Chapter 12 Cabinet installation 241 7401 240 5 2S1 ...
Страница 88: ...88 Chapter 13 Cable replacement 241 7401 240 5 2S1 ...
Страница 102: ...102 Chapter 18 Ethernet cable replacement 241 7401 240 5 2S1 ...
Страница 106: ...106 Chapter 19 External timing addition 241 7401 240 5 2S1 ...
Страница 110: ...110 Chapter 20 Failed FP cable replacement 241 7401 240 5 2S1 ...
Страница 132: ...132 Chapter 25 Function processor decommissioning 241 7401 240 5 2S1 ...
Страница 152: ...152 Chapter 32 Power cable replacement 241 7401 240 5 2S1 ...
Страница 156: ...156 Chapter 33 Power supply addition 241 7401 240 5 2S1 ...
Страница 160: ...160 Chapter 34 Power supply replacement 241 7401 240 5 2S1 ...
Страница 200: ...200 Chapter 37 Hardware procedures 241 7401 240 5 2S1 Figure 61 Installing a rear cover on a 5 slot Passport switch ...
Страница 228: ...228 Chapter 37 Hardware procedures 241 7401 240 5 2S1 Figure 77 16 slot Passport switch shelf assembly PPT 0892 001 AA ...
Страница 412: ...412 Chapter 37 Hardware procedures 241 7401 240 5 2S1 ...
Страница 436: ...436 Chapter 37 Hardware procedures 241 7401 240 5 2S1 ...
Страница 437: ......