
Chapter 37 Hardware procedures 259
Passport 7400 Hardware Installation, Maintenance, and Upgrade 5.2S1
Installing an Ethernet cable
Install an Ethernet cable as part of replacing a CP, or to replace a faulty cable.
Prerequisites
•
If the CP is spared, coordinate with the software network operator to
remove the CP from service if it is still active and to notify you when to
swap the cables. Alarms are generated when communication to a CP is
stopped.
•
If the CP is not spared, have the software operator disable the
SwitchoveronFailure attribute as described in the section “Changing the
switchover behavior of the OAM Ethernet port” in 241-5701-600
Passport 7400, 15000, 20000 Configuration Guide.
•
Route and label cables.
Procedure steps
1
Refer to the figure “Example of a control processor faceplate” (page 260)
to located the Ethernet connector on the CP faceplate.
2
Unplug the old cable at each end only when the CP is removed from
service in software. Immediately plug in the new cable.
3
Cut the connectors off the end of the old cable. Tugging or pulling on the
older cable can affect the operation of other cables. Unless it can be easily
removed, leave the old cable in position.
Содержание Passport 7400
Страница 1: ...Passport 7400 Hardware Installation Maintenance and Upgrade 241 7401 240 ...
Страница 2: ......
Страница 4: ......
Страница 6: ...6 Publication history 241 7401 240 5 2S1 ...
Страница 28: ...28 About this document 241 7401 240 5 2S1 ...
Страница 32: ...32 Chapter 1 3 slot Passport switch installation 241 7401 240 5 2S1 ...
Страница 42: ...42 Chapter 3 5 slot Passport switch installation 241 7401 240 5 2S1 ...
Страница 60: ...60 Chapter 5 16 slot Passport switch installation 241 7401 240 5 2S1 ...
Страница 66: ...66 Chapter 6 16 slot Passport switch shelf replacement 241 7401 240 5 2S1 ...
Страница 74: ...74 Chapter 9 Alarm hardware replacement 241 7401 240 5 2S1 ...
Страница 80: ...80 Chapter 11 BITS termination panel replacement 241 7401 240 5 2S1 ...
Страница 84: ...84 Chapter 12 Cabinet installation 241 7401 240 5 2S1 ...
Страница 88: ...88 Chapter 13 Cable replacement 241 7401 240 5 2S1 ...
Страница 102: ...102 Chapter 18 Ethernet cable replacement 241 7401 240 5 2S1 ...
Страница 106: ...106 Chapter 19 External timing addition 241 7401 240 5 2S1 ...
Страница 110: ...110 Chapter 20 Failed FP cable replacement 241 7401 240 5 2S1 ...
Страница 132: ...132 Chapter 25 Function processor decommissioning 241 7401 240 5 2S1 ...
Страница 152: ...152 Chapter 32 Power cable replacement 241 7401 240 5 2S1 ...
Страница 156: ...156 Chapter 33 Power supply addition 241 7401 240 5 2S1 ...
Страница 160: ...160 Chapter 34 Power supply replacement 241 7401 240 5 2S1 ...
Страница 200: ...200 Chapter 37 Hardware procedures 241 7401 240 5 2S1 Figure 61 Installing a rear cover on a 5 slot Passport switch ...
Страница 228: ...228 Chapter 37 Hardware procedures 241 7401 240 5 2S1 Figure 77 16 slot Passport switch shelf assembly PPT 0892 001 AA ...
Страница 412: ...412 Chapter 37 Hardware procedures 241 7401 240 5 2S1 ...
Страница 436: ...436 Chapter 37 Hardware procedures 241 7401 240 5 2S1 ...
Страница 437: ......