
Chapter 37 Hardware procedures 297
Passport 7400 Hardware Installation, Maintenance, and Upgrade 5.2S1
Procedure steps
1
Lay the wires from the timing source up to the connectors on the BITS
termination panel. Route the wires up or down the right side of the frame
against the cable management brackets.
2
Connect the wires at the timing source, using whatever method of
connection is required.
3
Label each timing wire pair at both end points to distinguish which is
reference 0 and which is reference 1.
4
Fasten the wires snugly with tie-wraps to whatever CPE wire support
system leads to the cable management brackets on the switch mounting
apparatus. Leave enough length at termination panel end of the wire to
attach the D-sub or coax connectors.
5
Assemble the cable with the appropriate connector. Refer to the pinout
tables below.
Procedure job aid
5
-7.5 db CSU
6
-15 db CSU
Table 5
Pinouts of the connectors for DS1 or E1 balanced
Pin
DS1 for BITS-0
DS1 for BITS-1
1
no connection
no connection
2
no connection
no connection
3
GND (ground)
GND (ground)
4
no connection
no connection
5
BITSRX0P
BITSRX1P
6
no connection
no connection
7
no connection
no connection
(Sheet 1 of 2)
Table 4 (continued)
Typical line build out application settings
Содержание Passport 7400
Страница 1: ...Passport 7400 Hardware Installation Maintenance and Upgrade 241 7401 240 ...
Страница 2: ......
Страница 4: ......
Страница 6: ...6 Publication history 241 7401 240 5 2S1 ...
Страница 28: ...28 About this document 241 7401 240 5 2S1 ...
Страница 32: ...32 Chapter 1 3 slot Passport switch installation 241 7401 240 5 2S1 ...
Страница 42: ...42 Chapter 3 5 slot Passport switch installation 241 7401 240 5 2S1 ...
Страница 60: ...60 Chapter 5 16 slot Passport switch installation 241 7401 240 5 2S1 ...
Страница 66: ...66 Chapter 6 16 slot Passport switch shelf replacement 241 7401 240 5 2S1 ...
Страница 74: ...74 Chapter 9 Alarm hardware replacement 241 7401 240 5 2S1 ...
Страница 80: ...80 Chapter 11 BITS termination panel replacement 241 7401 240 5 2S1 ...
Страница 84: ...84 Chapter 12 Cabinet installation 241 7401 240 5 2S1 ...
Страница 88: ...88 Chapter 13 Cable replacement 241 7401 240 5 2S1 ...
Страница 102: ...102 Chapter 18 Ethernet cable replacement 241 7401 240 5 2S1 ...
Страница 106: ...106 Chapter 19 External timing addition 241 7401 240 5 2S1 ...
Страница 110: ...110 Chapter 20 Failed FP cable replacement 241 7401 240 5 2S1 ...
Страница 132: ...132 Chapter 25 Function processor decommissioning 241 7401 240 5 2S1 ...
Страница 152: ...152 Chapter 32 Power cable replacement 241 7401 240 5 2S1 ...
Страница 156: ...156 Chapter 33 Power supply addition 241 7401 240 5 2S1 ...
Страница 160: ...160 Chapter 34 Power supply replacement 241 7401 240 5 2S1 ...
Страница 200: ...200 Chapter 37 Hardware procedures 241 7401 240 5 2S1 Figure 61 Installing a rear cover on a 5 slot Passport switch ...
Страница 228: ...228 Chapter 37 Hardware procedures 241 7401 240 5 2S1 Figure 77 16 slot Passport switch shelf assembly PPT 0892 001 AA ...
Страница 412: ...412 Chapter 37 Hardware procedures 241 7401 240 5 2S1 ...
Страница 436: ...436 Chapter 37 Hardware procedures 241 7401 240 5 2S1 ...
Страница 437: ......