
169
Passport 7400 Hardware Installation, Maintenance, and Upgrade 5.2S1
Chapter 37
Hardware procedures
Anchoring a seismic cabinet using an inside-mount
anchoring kit
Anchor a seismic cabinet using an inside-mount anchoring kit it to achieve
NEBS compliance and to keep the brackets isolated from the floor for
additional grounding protection.
Prerequisites
•
You will need an inside-mount anchoring kit with PEC NTFN98.
Procedure steps
1
Drill the holes for each of the anchors. Use a roto hammer drill and 18 mm
masonry drill bit to drill the holes. (The outside diameter of the anchor is
0.680 in.) Wear safety goggles when you drill the holes.
2
Clean each hole thoroughly with a vacuum cleaner.
3
Move the cabinet as close to its final position as possible.
4
Tip the cabinet and remove the casters and levellers from the bottom of
the cabinet. You will need at least one person to support the cabinet while
another person removes the casters and levellers.
5
Bolt the brackets to the outside of the front and back of the cabinet using
the eight bolts provided. See “Anchoring a seismic cabinet using an
inside-mount anchoring kit” (page 171).
Ensure that the brackets curve under the cabinet.
6
Carefully slide the cabinet into position.
Содержание Passport 7400
Страница 1: ...Passport 7400 Hardware Installation Maintenance and Upgrade 241 7401 240 ...
Страница 2: ......
Страница 4: ......
Страница 6: ...6 Publication history 241 7401 240 5 2S1 ...
Страница 28: ...28 About this document 241 7401 240 5 2S1 ...
Страница 32: ...32 Chapter 1 3 slot Passport switch installation 241 7401 240 5 2S1 ...
Страница 42: ...42 Chapter 3 5 slot Passport switch installation 241 7401 240 5 2S1 ...
Страница 60: ...60 Chapter 5 16 slot Passport switch installation 241 7401 240 5 2S1 ...
Страница 66: ...66 Chapter 6 16 slot Passport switch shelf replacement 241 7401 240 5 2S1 ...
Страница 74: ...74 Chapter 9 Alarm hardware replacement 241 7401 240 5 2S1 ...
Страница 80: ...80 Chapter 11 BITS termination panel replacement 241 7401 240 5 2S1 ...
Страница 84: ...84 Chapter 12 Cabinet installation 241 7401 240 5 2S1 ...
Страница 88: ...88 Chapter 13 Cable replacement 241 7401 240 5 2S1 ...
Страница 102: ...102 Chapter 18 Ethernet cable replacement 241 7401 240 5 2S1 ...
Страница 106: ...106 Chapter 19 External timing addition 241 7401 240 5 2S1 ...
Страница 110: ...110 Chapter 20 Failed FP cable replacement 241 7401 240 5 2S1 ...
Страница 132: ...132 Chapter 25 Function processor decommissioning 241 7401 240 5 2S1 ...
Страница 152: ...152 Chapter 32 Power cable replacement 241 7401 240 5 2S1 ...
Страница 156: ...156 Chapter 33 Power supply addition 241 7401 240 5 2S1 ...
Страница 160: ...160 Chapter 34 Power supply replacement 241 7401 240 5 2S1 ...
Страница 200: ...200 Chapter 37 Hardware procedures 241 7401 240 5 2S1 Figure 61 Installing a rear cover on a 5 slot Passport switch ...
Страница 228: ...228 Chapter 37 Hardware procedures 241 7401 240 5 2S1 Figure 77 16 slot Passport switch shelf assembly PPT 0892 001 AA ...
Страница 412: ...412 Chapter 37 Hardware procedures 241 7401 240 5 2S1 ...
Страница 436: ...436 Chapter 37 Hardware procedures 241 7401 240 5 2S1 ...
Страница 437: ......