4
Applications
54
Total Station DTM-322 Instruction Manual
4.
Sight PT1 and press
[MSR1]
or
[MSR2]
.
5.
To proceed to the next point, press
[ENT]
.
6.
Enter the second point (PT2) and its height of
target.
7.
Measure to PT2 and press
[ENT]
.
When the instrument has enough data, it
calculates the station (STN) coordinates.
–
If more than the minimum required data is
available, a standard deviation screen
appears.
–
To take measurements to strengthen
geometry of the resection, press the
Add
softkey. For information about the
View
softkey, see
deleting a measurement in resection,
page 55
8.
When the results are satisfactory, record the
station. To do this, press
[ENT]
or the
REC
softkey.
9.
Enter the height of instrument, if required. Press
[ENT]
. The ST field defaults to the last recorded
PT + 1.
10. To change the station name, move to the ST field
and edit or replace the text.
If you have set Split ST to Yes, the ST field defaults to the last recorded ST value + 1. For more information, see
.
Содержание HQA46480
Страница 1: ...www trimble com Total Station DTM 322 Instruction Manual Version A 1 0 0 Part Number C232E April 2009 ...
Страница 8: ...viii Total Station DTM 322 Instruction Manual ...
Страница 14: ...Contents xiv Total Station DTM 322 Instruction Manual ...
Страница 60: ...3 Getting Started 46 Total Station DTM 322 Instruction Manual ...
Страница 157: ...C H A P T E R 8 Total Station DTM 322 Instruction Manual 143 System Diagrams 8 In this chapter System Components ...
Страница 160: ...8 System Diagrams 146 Total Station DTM 322 Instruction Manual ...
Страница 176: ...9 Communications 162 Total Station DTM 322 Instruction Manual ...