Commercial Operation
99
Commercial Operation
The myPV ClearSky™ PLUS Interconnection is designed to require as little
maintenance possible, but like any equipment a little care ensures proper operation and
a long life of reliable service through the life of your Facility.
Recommended Maintenance Schedule
The myPV ClearSky PLUS is designed to be maintenance free, and requires no regular
consumables or maintenance service under normal operational conditions.
The following table established recommended inspection frequency for preventative
maintenance scheduling.
Inspection Frequency:
Inspection
Description
Every
(Yrs)
Outage
Inspect the external and internal metal surfaces for signs of
corrosion. If corrosion is found, brush-clean affected areas to
remove oxidation and debris, prime and paint with an outdoor
rated paint specifically for metal (steel) surfaces.
1
Verify the UPS battery indicator lights are not red.. If any of the
UPS indicator lights are red, contact us to determine the
appropriate corrective action.
1
Using the external wire-glass windows, view inside the Center
Switching Cabinet to inspect that it is free of debris, water,
animals, or other contamination. If contamination is observed,
make sure the myPV ClearSky is de-energized and LOTO'd to
allow for cleaning.
1
Содержание ClearSky Plus
Страница 16: ...Resources 16 West Terminations Side LV Cabinet West Terminations Side LV Cabinet Terminal Blocks 2 AWG Cu ...
Страница 21: ...Resources 21 ...
Страница 22: ...Resources 22 ...
Страница 28: ...Design Considerations 28 myPV ClearSky PLUS 25kV Termination Cabinet Door Swing ...
Страница 38: ...Receiving 38 Equipment is Wrapped Palletized Typically Equipment Delivery ...
Страница 45: ...Receiving 45 Top Fuse Mounting Hardware Three 3 MV Fuses Fully Assembled Installed ...
Страница 52: ...Electrical Terminations 52 LV Termination Cabinet ...
Страница 56: ...Network Integration 56 ...
Страница 64: ...Pre Energization Checks 64 View of Center Switching Cabinet Through Wire Glass Window ...
Страница 67: ...Pre Energization Checks 67 View of Three 3 PT Fuses Through Wire Glass Window ...
Страница 93: ...Operational Testing 93 Numbered Illustration of Protective Relay Indicators ...
Страница 102: ...Spare Parts 102 ...
Страница 103: ...Spare Parts 103 ...