Operational Testing
95
RVC Panel LED illumination status while “Close” button is pressed.
After ensuring that the red switch is in the automatic mode, press on the close button
located on the SEL-751, the feeder protection relay in the Interconnection box. As
soon as “Close” is pressed, the Pre-Energizing LEDs on the In-Rush Mitigation panel
shall respond immediately to the “Close” command. Therefore, the Pre-Energization
LED illuminates shows the system has entered the Pre-Energization phase.
The Closing Sequence
On the RVC Panel, the Grid Voltage has indicated a closed in status, for the transformer’s
energization. While rest of the LEDs has shown open status.
Содержание ClearSky Plus
Страница 16: ...Resources 16 West Terminations Side LV Cabinet West Terminations Side LV Cabinet Terminal Blocks 2 AWG Cu ...
Страница 21: ...Resources 21 ...
Страница 22: ...Resources 22 ...
Страница 28: ...Design Considerations 28 myPV ClearSky PLUS 25kV Termination Cabinet Door Swing ...
Страница 38: ...Receiving 38 Equipment is Wrapped Palletized Typically Equipment Delivery ...
Страница 45: ...Receiving 45 Top Fuse Mounting Hardware Three 3 MV Fuses Fully Assembled Installed ...
Страница 52: ...Electrical Terminations 52 LV Termination Cabinet ...
Страница 56: ...Network Integration 56 ...
Страница 64: ...Pre Energization Checks 64 View of Center Switching Cabinet Through Wire Glass Window ...
Страница 67: ...Pre Energization Checks 67 View of Three 3 PT Fuses Through Wire Glass Window ...
Страница 93: ...Operational Testing 93 Numbered Illustration of Protective Relay Indicators ...
Страница 102: ...Spare Parts 102 ...
Страница 103: ...Spare Parts 103 ...