Design Considerations
26
Design Considerations
Failing to plan is planning to fail. Although the myPV ClearSky™ PLUS is very simple to
design for and incorporate into your project design, there are aspects of the equipment
that should be considered in the initial design to avoid unnecessary costs and difficulties
during construction.
Installation Location
The myPV ClearSky PLUS must be installed in close proximity to the first inverter step-
up transformer unit (ISU) between your Facility’s interconnection and medium voltage
(MV) loop feed to support the additional secondary voltage connection the same ISU.
Dual, Primary and Secondary, Electrical Connections to First ISU
The myPV ClearSky PLUS’s low profile and compact design provides Developers and
Engineers and unprecedented level of flexibility regarding installation location. While
many customers choose to incorporate the padmount gear into the equipment pad
closest to the point of interconnection, others choose to locate the myPV ClearSky
PLUS at the Point of Interconnection (POI).
If you have concerns about the location of the myPV ClearSky PLUS’s metering and the
POI, we recommend one of the following 2 approaches:
Содержание ClearSky Plus
Страница 16: ...Resources 16 West Terminations Side LV Cabinet West Terminations Side LV Cabinet Terminal Blocks 2 AWG Cu ...
Страница 21: ...Resources 21 ...
Страница 22: ...Resources 22 ...
Страница 28: ...Design Considerations 28 myPV ClearSky PLUS 25kV Termination Cabinet Door Swing ...
Страница 38: ...Receiving 38 Equipment is Wrapped Palletized Typically Equipment Delivery ...
Страница 45: ...Receiving 45 Top Fuse Mounting Hardware Three 3 MV Fuses Fully Assembled Installed ...
Страница 52: ...Electrical Terminations 52 LV Termination Cabinet ...
Страница 56: ...Network Integration 56 ...
Страница 64: ...Pre Energization Checks 64 View of Center Switching Cabinet Through Wire Glass Window ...
Страница 67: ...Pre Energization Checks 67 View of Three 3 PT Fuses Through Wire Glass Window ...
Страница 93: ...Operational Testing 93 Numbered Illustration of Protective Relay Indicators ...
Страница 102: ...Spare Parts 102 ...
Страница 103: ...Spare Parts 103 ...