Operational Testing
87
Operational Testing
Energized and ready to operate, let’s verify proper operation of the myPV ClearSky™
PLUS Interconnection..
Safety First!
This procedure is written to follow the conditions set by the prior section of this manual,
If you have not yet performed the Initial Energization, or have taken any actions that
altered the as-left conditions of the myPV ClearSky PLUS set forth at the completion of
the Initial Energization, we strongly recommend performing the Initial Energization
before proceeding.
The following steps will allow interconnection voltage to flow through the myPV
ClearSky, from the Utility side, through the internal MV VFI breakers, to the Solar side,
and to any electrically equipment that is in a CLOSED circuit condition.
Improper PPE, tools, and/or knowledge will result in staff being exposed to the
full interconnection voltage and could result in injury and/or death.
The following steps should only be conducted by authorized and qualified commission
staff.
Содержание ClearSky Plus
Страница 16: ...Resources 16 West Terminations Side LV Cabinet West Terminations Side LV Cabinet Terminal Blocks 2 AWG Cu ...
Страница 21: ...Resources 21 ...
Страница 22: ...Resources 22 ...
Страница 28: ...Design Considerations 28 myPV ClearSky PLUS 25kV Termination Cabinet Door Swing ...
Страница 38: ...Receiving 38 Equipment is Wrapped Palletized Typically Equipment Delivery ...
Страница 45: ...Receiving 45 Top Fuse Mounting Hardware Three 3 MV Fuses Fully Assembled Installed ...
Страница 52: ...Electrical Terminations 52 LV Termination Cabinet ...
Страница 56: ...Network Integration 56 ...
Страница 64: ...Pre Energization Checks 64 View of Center Switching Cabinet Through Wire Glass Window ...
Страница 67: ...Pre Energization Checks 67 View of Three 3 PT Fuses Through Wire Glass Window ...
Страница 93: ...Operational Testing 93 Numbered Illustration of Protective Relay Indicators ...
Страница 102: ...Spare Parts 102 ...
Страница 103: ...Spare Parts 103 ...