Initial Energization
77
ClearSky PLUS!
ClearSky Plus Cabinet
The ClearSky Plus has two cabinets integrated. The ClearSky control cabinet locates on
the right and the ClearSky Plus in rush mitigation control cabinet locates on the left.
View of the front side of the ClearSky PLUS.
DANGER!!!
All Steps Following This Sentence Will Introduce
Interconnection Voltage to the Facility and the myPV
Содержание ClearSky Plus
Страница 16: ...Resources 16 West Terminations Side LV Cabinet West Terminations Side LV Cabinet Terminal Blocks 2 AWG Cu ...
Страница 21: ...Resources 21 ...
Страница 22: ...Resources 22 ...
Страница 28: ...Design Considerations 28 myPV ClearSky PLUS 25kV Termination Cabinet Door Swing ...
Страница 38: ...Receiving 38 Equipment is Wrapped Palletized Typically Equipment Delivery ...
Страница 45: ...Receiving 45 Top Fuse Mounting Hardware Three 3 MV Fuses Fully Assembled Installed ...
Страница 52: ...Electrical Terminations 52 LV Termination Cabinet ...
Страница 56: ...Network Integration 56 ...
Страница 64: ...Pre Energization Checks 64 View of Center Switching Cabinet Through Wire Glass Window ...
Страница 67: ...Pre Energization Checks 67 View of Three 3 PT Fuses Through Wire Glass Window ...
Страница 93: ...Operational Testing 93 Numbered Illustration of Protective Relay Indicators ...
Страница 102: ...Spare Parts 102 ...
Страница 103: ...Spare Parts 103 ...