Electrical Terminations
49
Solid 3/8” Diameter Copper Grounding Rod
Common in Both Termination Cabinets
Customer Installed Irreversible Crimp
Shown
Proper Phasing is Required
The myPV ClearSky™ PLUS’s normal switching operation requires that the MV and LV
circuits be connected in parallel for a short period of time, improper phasing will result in
an electrical event that could be unsafe and also damage all connected equipment.
Required Phasing Connections:
Proper A, B, C phasing is required between the MV terminations of the myPV
ClearSky PLUS and the first ISU’s primary connections
Proper A, B, C phasing is required between the LV terminations of the myPV
ClearSky PLUS and the first ISU’s secondary connections
Содержание ClearSky Plus
Страница 16: ...Resources 16 West Terminations Side LV Cabinet West Terminations Side LV Cabinet Terminal Blocks 2 AWG Cu ...
Страница 21: ...Resources 21 ...
Страница 22: ...Resources 22 ...
Страница 28: ...Design Considerations 28 myPV ClearSky PLUS 25kV Termination Cabinet Door Swing ...
Страница 38: ...Receiving 38 Equipment is Wrapped Palletized Typically Equipment Delivery ...
Страница 45: ...Receiving 45 Top Fuse Mounting Hardware Three 3 MV Fuses Fully Assembled Installed ...
Страница 52: ...Electrical Terminations 52 LV Termination Cabinet ...
Страница 56: ...Network Integration 56 ...
Страница 64: ...Pre Energization Checks 64 View of Center Switching Cabinet Through Wire Glass Window ...
Страница 67: ...Pre Energization Checks 67 View of Three 3 PT Fuses Through Wire Glass Window ...
Страница 93: ...Operational Testing 93 Numbered Illustration of Protective Relay Indicators ...
Страница 102: ...Spare Parts 102 ...
Страница 103: ...Spare Parts 103 ...