Initial Energization
81
~24V DC (-0.1V/+6.0V , 23.9 - 30.0V) voltage on the top (battery) terminals of
the UPS
~24V DC (±0.1V, 23.9 - 24.1V) voltage on the top (input) terminals of the UPS
3. CLOSE the 10A Fuse Holder [DC Bus 300 / 302b]
4. Visually verify “Green/Blue/Yellow/Red” power/status indicator lights on the
following equipment:
◦ Hub-E8 - Network Switch (Based on Customer options, there may be additional
devices)
◦ RV50 - Cellular Modem
◦ myPV-IQ - Edge Computer for myPV IQ™ - Remote Interface
◦ BRKR-A - Phase-A Tavrida VFI Control Module
◦ BRKR-B - Phase-B Tavrida VFI Control Module
◦ BRKR-C - Phase-C Tavrida VFI Control Module
5. [Located on the front swing panel dead front] Verify the following components have
signs for energization:
◦ SEL-735 Power Quality Meter (Monochrome LCD Screen should display
information)
◦ SEL-751 Protection Relay (Color LCD Screen should display information)
Содержание ClearSky Plus
Страница 16: ...Resources 16 West Terminations Side LV Cabinet West Terminations Side LV Cabinet Terminal Blocks 2 AWG Cu ...
Страница 21: ...Resources 21 ...
Страница 22: ...Resources 22 ...
Страница 28: ...Design Considerations 28 myPV ClearSky PLUS 25kV Termination Cabinet Door Swing ...
Страница 38: ...Receiving 38 Equipment is Wrapped Palletized Typically Equipment Delivery ...
Страница 45: ...Receiving 45 Top Fuse Mounting Hardware Three 3 MV Fuses Fully Assembled Installed ...
Страница 52: ...Electrical Terminations 52 LV Termination Cabinet ...
Страница 56: ...Network Integration 56 ...
Страница 64: ...Pre Energization Checks 64 View of Center Switching Cabinet Through Wire Glass Window ...
Страница 67: ...Pre Energization Checks 67 View of Three 3 PT Fuses Through Wire Glass Window ...
Страница 93: ...Operational Testing 93 Numbered Illustration of Protective Relay Indicators ...
Страница 102: ...Spare Parts 102 ...
Страница 103: ...Spare Parts 103 ...