Commercial Operation
100
Inspection
Description
Every
(Yrs)
Outage
Following isolation and LOTO, the Utility side MV Termination
cabinet should be opened to: 1. Inspect that it is free of debris,
water, animals, or other contamination 2. MV elbows are firmly
seated 3. MV conductors are fee of defects 4. All grounds and
bleed wires are intact 5. Electrical conduits are sealed 1. If
contamination is observed, the cabinet should be cleaned. If
unseated, MV elbows should be removed, new silicon applied,
and re-seated.If damaged, MV conductors should be
services/replaced by a qualified party. If poor/un-grounded,
grounds should be repaired and tested.If unsealed, conduits
should be re-sealed.
2
Following isolation and LOTO, the Solar side MV Termination
cabinet should be opened to: 1. Inspect that it is free of debris,
water, animals, or other contamination 2. MV elbows are firmly
seated 3. MV conductors are free of defects 4. All grounds and
bleed wires are intact 5. Electrical conduits are sealed 1. If
contamination is observed, the cabinet should be cleaned.If
unseated, MV elbows should be removed, new silicon applied,
and re-seated.If damaged, MV conductors should be
serviced/replaced by a qualified party. If poor/un-grounded,
grounds should be repaired and tested. If unsealed, conduits
should be re-sealed.
2
Содержание ClearSky Plus
Страница 16: ...Resources 16 West Terminations Side LV Cabinet West Terminations Side LV Cabinet Terminal Blocks 2 AWG Cu ...
Страница 21: ...Resources 21 ...
Страница 22: ...Resources 22 ...
Страница 28: ...Design Considerations 28 myPV ClearSky PLUS 25kV Termination Cabinet Door Swing ...
Страница 38: ...Receiving 38 Equipment is Wrapped Palletized Typically Equipment Delivery ...
Страница 45: ...Receiving 45 Top Fuse Mounting Hardware Three 3 MV Fuses Fully Assembled Installed ...
Страница 52: ...Electrical Terminations 52 LV Termination Cabinet ...
Страница 56: ...Network Integration 56 ...
Страница 64: ...Pre Energization Checks 64 View of Center Switching Cabinet Through Wire Glass Window ...
Страница 67: ...Pre Energization Checks 67 View of Three 3 PT Fuses Through Wire Glass Window ...
Страница 93: ...Operational Testing 93 Numbered Illustration of Protective Relay Indicators ...
Страница 102: ...Spare Parts 102 ...
Страница 103: ...Spare Parts 103 ...